Tag Archives: concrete machine

Road Machinery Concrete Finishing Machine Power Trowel

Road Machinery Concrete Finishing Machine Power Trowel

Item Description                             
 Concrete Electrical power Trowel CZPT is mainly utilized for the concrete area of the slurry, compa-
ction, smoothing, wiping light-weight,which is also used for both floating and ending concrete floors.  
 
 CZPT Specifications                          

Model YG-1000
Motor 24P
Functioning method Ride on
Diameter 1000mm
Blade Amount 8 PCS
Blade Dimensions 350*150*2mm
Rotation Velocity 140r/min
Fuel potential 20L
Engine oil potential 1.5L
Bodyweight 430kg
CZPTting method CZPTtric starting
CZPT dimensions 2080*1050*1180mm

 

Model YG-800 YG-900 YG-one thousand
Motor Honda GX390/CZPT Honda GX630/lifan Honda GX630/CZPT
Power  13hp 20hp 24hp
Variety of blade 8pcs 8pcs 8pcs
Plate diameter 800mm 900mm 1000mm
Spanner velocity -140 r/min
Weight 300kg 380kg 430kg
Engine speed  3600r/min
Gasoline tank capacity 20L
Procedure variety Driving
Trowel blade  Size 350*one hundred fifty*2mm
Hole pitch 65-120mm
Size ——- 2080*1050*1180mm

Product Features                                 

one. Effortless and Smooth operation to control, which  helps make it simple to modify the blade pitch and the
route.
two. Most recent craftsmanship of lower center of gravity design and style provides protection and stable procedure
three. Outstanding decreasing vibration manage can make the procedure straightforward and pleasant
four. Reduction equipment-box, shafts and gears and other areas are 1-time processed by digit manage
center, made of aluminum alloy
five. The important element of trowel blade supporting arm is made of massive diameter carbon metal, which h-
as been strictly heat-taken care of, a lot more steady.
 
Merchandise Show                                   

Package and Delivery                                
one. Package: CZPT circumstance.
Small order: we propose DHL/UPS/TNT/FEDEX or by air.
Bulk purchase: we propose by air or by sea through the conditions :EXW, FOB, CFR, CIF, CPT, CIP, DAF, and so on.
2. CZPT: It is in accordance to the design and quantity.
CZPTly it is three-five days if the equipment are in inventory.
It will be 15-30 times if you want to personalize the equipment.

Certificates                                    

Organization Profile                                
    CZPT Co.,Ltd.is a collection of mining products, tunnel bridge construction equ-
ipment, highway floor development products and so on. with investigation and improvement, generation, income as
one of the premier engineering equipment producing enterprises. Main items managed by our co-
mpany is presently associated in highways, CZPTs, tunnels, subway tunnels, large-speed rail, light-weight rail tra-
nsit mining resources exploitation, coal and non coal mine location.
      We believe that great product can demonstrate everything, including the quality, the frame of mind, the latest
craftsmanship and the product idea to innovate a very good item, each employees is trained and follow-
d professionally, so we can advocate you the most appropriate tools. Each and every equipment has to be
strictly examined ahead of supply. Any question about the equipment will be replied inside of 24 hrs.
      We are expecting your arrival and right right here waiting around for you all the time!

Costumer Pay a visit to                                   

If you require our products or need overseas technological assistance,please feel totally free to make contact with us.We will be listed here for you
                                      like usually.Sincerely forwarding to working with you in in close proximity to foreseeable future.

Payment CZPTs                                       
We acknowledge L/C, T/T, CZPT CZPT, Cash Gram, Paypal, Alibaba Escrow and so on.

Payment<=USD 5000, 100% in advance.
Payment>=USD 5000, 30% T/T in progress, equilibrium ahead of shipment.

FAQ                                               
one. Q: Are you investing business or manufacturer?
    A: We are CZPT gear producer.
two. Q: How prolonged is your delivery time?
    A: It is in accordance to the design and quantity.
        CZPTly it is 3-5 times if the devices are in inventory.
        It will be 15-30 days if you want to customize the equipment.
three. Q: Do you give samples? Is it free or added?
    A: Yes, we could provide you the sample machine.
        But it really is not free. You want to spend for the sample and the value of freight.
4. Q: What is your phrases of payment?
    A: We accept T/T, CZPT CZPT, Money Gram, Paypal, Alibaba Escrow etc.
        Payment<=USD 5000, 100% in advance.
        Payment>=USD 5000, thirty% T/T in advance, harmony before shipment.

Get in touch with Us                                    

 

Road Machinery Concrete Finishing Machine Power Trowel

Npd2000 No Dig Machine for Concrete Pipe

Npd2000 No Dig Machine for Concrete Pipe

Major Parts Model :

No. Element Name Brand name
1 Gear Reducers Dinamic/ Bonfiglioli
two PLC program controller MITSUBISHI,Japan
three Touch Monitor MITSUBISHI,Japan
four Steering Solenoid valve BMEG,Germany
5 CZPT valve BMEG,Germany
6 Major CZPTtrical factors Schneider
7 Stress oil pump ZheJiang shenfu
eight CZPTtric motor Siemens
nine Major axle material 42CrMo
10 Alloy cutter materials Tungsten carbide YG11
eleven Shell materials Q235

 

Primary CZPT Specification
No. Product OD*L Main Electricity Rectify technique Oil cylinder thrust Greatest torque of Reducing Head (KN.M) Rpm of Slicing Head (r/min) Oil cylinder thrust of Main CZPT Pressure of oil cylinder(Mpa) Discharge Pipe Dimensions (mm)
one JR500 Φ695*2950 22*one 220KN*four 15.3 thirteen.seven 200T*2 31.5 Φ75
two JR600 Φ795*2840 22*1 310KN*4 15.three thirteen.seven 200T*two 31.five Φ75
three JR800 Φ980*4400 thirty*one 550KN*five fifty seven 5 200T*2 31.five Φ100
four JR1000 Φ1220*4400 15*3 480KN*four 89 3.two 200T*2 31.5 Φ100
five JR1200 Φ1460*3800 18.5*3 630KN*4 177 two.seven 200T*2 31.5 Φ100
/22*three
6 JR1350 Φ1640*4500 22*3 630KN*four 177 2.7 200T*two 31.five Φ125
seven JR1500 Φ1820*5000 thirty*three 630KN*4 276 2.seven 200T*two 31.five Φ125
/1600 /Φ2000*5000
8 JR1800 Φ2180*5000 thirty*4 800KN*eight 415 2.five 200T*four 31.5 Φ125
/2000 /Φ2420*5000 200T*six
nine JR2200 Φ2660*5200 37*4 800KN*eight 553 two.5 200T*six 31.5 Φ150
10 JR2400 Φ2900*5600 thirty*6 990KN*8 553 two.5 200T*6 31.5 Φ150
eleven JR2600 Φ3160*5850 37*6 990KN*eight 837 2.five 200T*eight 31.5 Φ150
/2800 /Φ3350*5850
twelve JR3000 Φ3580*5900 37*8 1240KN*8 1719 2.5 200T*8 31.five Φ150

Inside Construction :

Crushing Head Details :

Principal Axis and Gear Reducers  Details :

CZPTtric Cupboard Details :

CZPT Case :

Solution Description :
Pipe Jacking CZPT 2000mm designed for big pipe jacking engineering , generally utilized in the construction of cement pipe crossings, building residences translation, sewers, streets and rivers as a sheathing of other initiatives throughout a variety of channels.

Basic principle :
Pipe jacking development is in the operate in the pit ,by signifies of jacking CZPT which produce jacking pressure, and defeat the friction in between the pipes and the bordering soil.
Jacking the pipes Into the soil at the design and style slope.and Taken off soils .
Following a section of pipe complete jacking into the soil , then the CZPT area of the pipes continue to jack into the soil , The principle is by signifies of the thrust of the primary cylinder    pipeline, intermediate jacking station,and other thrust pushing the tool pipe or heading equipment (via the soil )from operating properly to the acquiring effectively and Lift up. Then , embed the pipes amongst the two wells.
 
Major Functions:
Whole Part rock earth pressure screen system.
The separated one grouting system for cutter panel and spindle centre.
The rear of jacking pipe equipment geared up with jacking unit and stop deviation system.
Disk cutter adopts CZPT China manufacturer.
Planetary gearbox adopts Italian BREVINI.
Adopt contact display, PLC CZPT and other innovative management method.
The information exhibited on the contact display can be connected to users  office check via RS232 interface.

Advantage :
The benefit of this approach is no excavation on the floor,Do not demolition,Does not wipe out the ground buildingsDon’t injury the atmosphere,Does not affect pipeline phase deformation,Time-saving, efficient, risk-free, lower overall expense.
The technological innovation are extensively employed in city underground h2o offer and drainage pipeline,CZPT fuel pipeline,Interaction cable and other non excavation laying.It can by way of the highway, railway, bridge, mountains, rivers, channel and any developing on the floor.The use of the technological innovation building, can help save a large quantity of land acquisition and demolition fees,also can minimize environmental air pollution and street congestion,It has significant economic and social positive aspects.

Working Frequency :
1.Using in ROCK condition
2.Widely employed in CZPT Asian nations, ZheJiang , and Japan.
3.Inside of cement pipe dia from a thousand-3200 mm
four.Specialist manufacturer who can produce ROCK pipe jacking equipment in China.
 
CZPT & CZPT :
Nude Packing
Delivery Depth:
60 days following 30% deposit acquiring
 
Our Solutions :
 We will ship professional technician to your venture web site to run the pipe jacking machine and practice operators for the task,  
one.On internet site provider help
2. 12month guarantee
3.Life time services assistance,
4. 7 days*24hours Hot-line & Email Service. 
5.Your inquiry related to our pipe jacking machine will be replied inside 24 hours.Effectively-skilled and experienced workers will solution all your concerns in fluent English.
 
Warranty :
If quality & assembling issue triggered difficulties, we just take liable on spare areas and all services expenses.
If misuse or human elements brought on the problems, customers shall just take liable on spare areas and all provider fees.

Chinese Patent of Compund Pipe Jacking CZPT

1.Introduction to CZPT Efficiency
A.The whole machine is water-proof (Chinese patent amount ZL201822154528.).
B.By eliminating the crushing wheel and the attachment of cutter head ,  this  machine can be remoulded to the panel machine which is a lot more efficient  for silty clay layer construction and the device can be remoulded in the building web site.(accessories incorporated)
C.There is no need to have to return to the manufacturing facility.By changing the rock cutter head on the site and connecting the front monitor, the rock equipment required for pure rock geology can be fashioned (marketed separately).
D.According to numerous years of development expertise, we blended with actual doing work situations.We  developed electronic integrated management technique independently, that can handle the  pump and valve team parts integratedly in the course of the whole development process.Also, the entire procedure of construction  can be hassle-free, simple, risk-free and reputable.

2. Geological situations relevant to manufacturing unit tools (patent software variety 201915715.four)
A.It is appropriate for pebble layer, sand pebble layer, soil pebble layer with particle size <= 30% of its own pipe diameter.
B.Miscellaneous filling layer (no steel bar, big volume of non-degradable gentle domestic rubbish), plain filling layer
C.Ideal for all varieties of difficult non-strongly cohesive soil layers with uniaxial compressive toughness <= 10MPa
D.Combined with soil improvement media to adapt to different sand layers

3.Particular Design and style
Electricity technique of the equipment , correction technique of the pumping station, bypass program, strain checking method and management technique can all be developed for intercommunication of adjacent pipe diameters.Illustration:Ø800 and Ø1000 can be shared

The CZPTence of Cutting Head of Compound Pipe Jacking CZPT

Venture Case :

Shipping information and service soon after offer :

one)PAYMENT Phrases:
T/T :thirty% as progress payment and T/T 70% compensated prior to shipment
2) DELIVERY  :
30 days following receipt of 30% advance payment
3 )Provider Right after Offer:
Electricity box, motor, reducer box warranty interval is 1 12 months, throughout this one particular 12 months service , non-human or unnatural disasters which led to any issues, we offer totally free routine maintenance services to buyer’s CZPT Website.
CZPT system, electrical technique warranty time period is six months, This sort of as human factors direct to any issues and want to exchange with new one, we will sell the CZPT and electrical components at our value value , buyer will bear the expense of CZPT and electrical elements and CZPT specific charges.
Soon after the device arrived at your CZPT internet site, we will ship 2 machine operators whose wage is USD200/working day, kindly also offer our individuals ‘s place and meals and round vacation air tickets throughout the period of time of construction.

Npd2000 No Dig Machine for Concrete Pipe